EV Charger Installation in Dubai: (2026 Guide)
At Watts & Ergon, a DEWA-approved solar and electrical contractor, we provide complete EV charger installation services for villas, apartments, offices, hotels, and commercial properties across Dubai.
Only DEWA-enrolled solar PV contractors and consultants can submit applications. Homeowners and businesses work through an approved partner like Watts & Ergon, . Attempting the process yourself will not succeed, as DEWA’s portal restricts submissions to enrolled companies.
Installing solar panels in Dubai is one of the smartest ways to cut electricity bills, increase property value, and support the emirate’s clean energy goals. All grid-connected solar PV systems fall under DEWA’s Shams Dubai program (net metering). You cannot simply install panels and connect them to the grid — formal approval is mandatory.
Only DEWA-enrolled solar PV contractors and consultants can submit applications. Homeowners and businesses work through an approved partner like Watts & Ergon, . Attempting the process yourself will not succeed, as DEWA’s portal restricts submissions to enrolled companies.
Here’s the clear, up-to-date process for getting solar panel installation approval in Dubai.
DEWA requires approval to ensure:
Unauthorized installations risk disconnection, fines, and invalidation of any generation credits.
Start by selecting a company from DEWA’s official list of enrolled solar PV contractors and consultants (available on the DEWA website under Solar Community).
Watts&ergon is a DEWA-enrolled contractor. We handle site assessment, design, documentation, application submission, installation, and final connection on your behalf. You do not interact with DEWA’s portal directly.
Our engineers visit your property to evaluate:
You receive a clear proposal with system size (kWp), expected annual generation, estimated savings, and payback period.
We prepare a complete technical package that meets DEWA’s Distributed Renewable Resources Generation (DRRG) standards. This includes:
Only DEWA-listed (eligible) equipment is used.
The contractor submits a single consolidated application for “Getting Solar Permits & Connections.” This covers the Solar NOC (No Objection Certificate) and design approval in one process.
Key documents typically required:
After submission you receive an application reference number (format S-0xxxxx) for tracking via the DEWA website or Smart App.
DEWA reviews the application (usually 5–15 working days for standard residential systems). They may request clarifications or corrections. Once approved, DEWA issues:
Installation begins only after formal approval. Watts&ergon uses certified technicians, DEWA-eligible panels and inverters, proper DC isolators, and safety systems. Work follows the approved design exactly.
Once installation is complete, the contractor requests DEWA inspection. DEWA inspects the system (often same-day results), installs the bi-directional generation meter, and activates the connection. You then sign the Connection Agreement if not already done.
Your system begins generating. Excess energy is exported to the DEWA grid and credited to your account under Shams Dubai net metering rules. Credits typically offset future consumption.
| Stage | Typical Duration | Notes / Fees |
|---|---|---|
| Contractor engagement & site assessment | 1–5 days | Free consultation with Watts&ergon |
| Design & documentation | 3–10 days | Included in our service |
| DEWA application review & NOC | 5–15 working days | Application itself is free |
| Installation | 1–3 weeks (size-dependent) | Depends on system size |
| Inspection & connection | 1–2 weeks after ready | Connection/meter fee applies (often around AED 1,500 range; confirm current rates) |
| Total process | 4–12 weeks | Residential systems are usually faster |
Larger commercial systems or those needing developer NOC / structural clearance from Dubai Municipality can take longer.
Watts & Ergon, manages these extra steps when needed.
Navigating DEWA’s Shams Dubai process is straightforward when you partner with an experienced, enrolled contractor. At Watts & Ergon, we take care of every stage — from free site assessment and compliant design to full approval, professional installation, and grid connection — so you can start saving on electricity bills with confidence.
Contact Watts & Ergon, today for a free consultation and personalized solar proposal tailored to your Dubai property. Let’s make your solar journey simple, compliant, and rewarding.

At Watts & Ergon, a DEWA-approved solar and electrical contractor, we provide complete EV charger installation services for villas, apartments, offices, hotels, and commercial properties across Dubai.

At Watts & Ergon, a DEWA-approved and ISO-certified solar EPC contractor, we specialize in designing and installing high-performance rooftop solar systems tailored specifically for warehouses, distribution centers, and industrial facilities across Dubai and the UAE.

At Watts & Ergon, a DEWA-enrolled, ISO-certified solar EPC contractor, we design and install systems specifically engineered for UAE conditions. Here’s what actually works in 2026.